Marti Miralles Arquitectes
DeveloperAYUNTAMIENTO DE YEBES
LocationYebes, Guadalajara
Project2009
Floor area48,338 m²
RUNNER UP
We accept the role that facilities play in the city, the importance of their location in the urban network and their ability to be landmarks within the urban landscape. We therefore proposed situating the public buildings opposite the main avenue of the new urban settlement, which runs tangentially down one side of the plot and diametrically crosses the town.
We grouped the facilities into two buildings that flank the entrance to the interior courtyard and on the perimeter we arranged shops and offices, designed in three modules so they can be built in stages.
The shopping centre car park occupies two floors below the square. Parking for the facilities occupies two basement levels of the administrative building.
We accept the role that facilities play in the city, the importance of their location in the urban network and their ability to be landmarks within the urban landscape. We therefore proposed situating the public buildings opposite the main avenue of the new urban settlement, which runs tangentially down one side of the plot and diametrically crosses the town.
We grouped the facilities into two buildings that flank the entrance to the interior courtyard and on the perimeter we arranged shops and offices, designed in three modules so they can be built in stages.
The shopping centre car park occupies two floors below the square. Parking for the facilities occupies two basement levels of the administrative building.